Tumblelog by Soup.io
Newer posts are loading.
You are at the newest post.
Click here to check if anything new just came in.

June 11 2017

shallow
18:11
8459 edb4 500
NPP/AKW Zwentendorf, June 7th 2017,turbine hall, one of the three low pressure turbines. There were three low pressure and one high pressure turbine on one shaft.
shallow
18:09
8399 8616 500
NPP/AKW Zwentendorf, June 7th 2017,manual valve control
shallow
18:09
8395 fcfb 500
NPP/AKW Zwentendorf, June 7th 2017,control rods from below
shallow
18:08
8388 01f4 500
NPP/AKW Zwentendorf, June 7th 2017,control rods are moved into the reactor from below (because the steam connection is already on the top)
shallow
18:07
8356 2e85 500
NPP/AKW Zwentendorf, June 7th 2017,bottom of containment, mechanics of the control rods (from below)
shallow
18:04
8333 f9fe 500
NPP/AKW Zwentendorf, June 7th 2017,inside the mid section of the spherical containment
shallow
18:01
8307 f176 500
NPP/AKW Zwentendorf, June 7th 2017,emergency tanks inside the containment
shallow
18:00
8287 7ce1 500
NPP/AKW Zwentendorf, June 7th 2017,pressure pipes
shallow
17:59
8262 4515 500
NPP/AKW Zwentendorf, June 7th 2017,mid section of containment
shallow
17:58
8238 56a5 500
NPP/AKW Zwentendorf, June 7th 2017, top entrance into containment
shallow
17:57
8226 e173 500
NPP/AKW Zwentendorf, June 7th 2017,impressions
shallow
17:56
8214 01c2 500
NPP/AKW Zwentendorf, June 7th 2017,impressions
shallow
17:56
8185 0748 500
NPP/AKW Zwentendorf, June 7th 2017,top part of the spherical containment; it contains the reactor core, the control rods and some pressure tanks.
Reposted byschaaf schaaf
shallow
17:52
7932 e759 500
NPP/AKW Zwentendorf, June 7th 2017,upper end of one 8x8 fuel-rod holder.
shallow
17:51
7883 6cab 500
NPP/AKW Zwentendorf, June 7th 2017,fuel rod close up, water will rush from this end (the bottom) up to the top while cooling the rods and taking energy with them.
shallow
17:49
7732 736e 500
NPP/AKW Zwentendorf, June 7th 2017, view into the reactor core and the reactor basin. The upper square basin is only filled with water when the fuel roads are moved to the storage area behind the slit.
shallow
17:46
7617 d6f4 500
NPP/AKW Zwentendorf, June 7th 2017,view from above into the reactor core, this section would normally be covered in water
shallow
17:45
7596 e6e8 500
NPP/AKW Zwentendorf, June 7th 2017,reactor hall with fuel rod crane (orange)
shallow
17:43
7573 eb2b 500
NPP/AKW Zwentendorf, June 7th 2017,change room - special underwear and clothing for nuclear area
Reposted bysecalecornutuumwasnae
shallow
17:42
7560 5368 500
NPP/AKW Zwentendorf, June 7th 2017
Older posts are this way If this message doesn't go away, click anywhere on the page to continue loading posts.
Could not load more posts
Maybe Soup is currently being updated? I'll try again automatically in a few seconds...
Just a second, loading more posts...
You've reached the end.

Don't be the product, buy the product!

Schweinderl