Tumblelog by Soup.io
Newer posts are loading.
You are at the newest post.
Click here to check if anything new just came in.
shallow
18:08
8388 01f4 500
NPP/AKW Zwentendorf, June 7th 2017,control rods are moved into the reactor from below (because the steam connection is already on the top)

Don't be the product, buy the product!

Schweinderl